a
Lorem ipsum gravida nibh vel velit auctor aliquetenean sollicitudin, lorem quis bibendum auci elit consequat ipsutis sem nibh id elit duis sed.
Monday - Friday 08:00 - 20:00

Saturday and Sunday - CLOSED

+ 0800 2466 7921

office@mikado-themes.com

34th Avenue

New York, W2 3XE

Top
 

Tornado Water Treatment

Tornado Water Treatment is one of the leading providers of water & water treatment solutions in the UAE.

Tornado provides complete design, engineering, procurement, and construction services to our clients. We utilize our procurement and construction talents in combination with our engineering specialists to bring the best technical solutions at a competitive cost.

Tornado Water Treatment has developed a long track record of delivering high quality and cost-effective engineering solutions. Our success has been achieved with the help of leading-edge technology and people who are experts in the water treatment field. Consequently, our volume of repeat commissions, contract renewals and referrals from our satisfied clients reflects the high esteem for our services.

  • All
  • Completed

Effluent Treatment Plant – Nahel Dairy Farm

SCOPE: Supply, Installation, Testing and Commissioning and Maintenance of Effluent Treatment Plant Capacity: 1000 m3/day CLIENT: Elite Agro LLC LOCATION: Al Ain – United Arab Emirates COMPLETION YEAR: 2017 PROJECT STATUS: Completed

Sea Water Intake System – La Digue SWRO Plants

SCOPE: Design, Supply, Installation of Sea Water Intake System - La Digue Desalination Plants Capacity: 5,280 m3/day flow Demolition of Existing Well Temporary Rock Armoring to break waves Excavation of New Well Laying of Geotextile Sheets Excavation Works Rock Pitching Laying of Geotextiles Sheets Basin...

TSE Treatment System – Dubai International Financial

SCOPE: Design, Supply, Installation, Testing & Commissioning of the treated sewage effluent treatment system at the Dubai International Financial Centre District Cooling Plant. Pretreatment for 3000 m3/day TSE Treatment System LOCATION: Dubai - United Arab Emirates CLIENT: Emirates Central Cooling Systems Corporation (Empower) COMPLETION YEAR:...

Jumeirah Beach Residence District Cooling Plant

SCOPE: Design, Supply, Installation, Testing & Commissioning of the Blowdown Recovery System at Jumeirah Beach Residence District Cooling Plant. Capacity: Pre-treatment for 1000 m3/day LOCATION: Jumeirah Beach Residence, Dubai - United Arab Emirates CLIENT: Emirates Central Cooling Systems Corporation (Empower) COMPLETION YEAR: 2007 PROJECT STATUS:...

SWRO Desalination Plant – Eve Island Praslin

SCOPE: Installation and Commissioning of SWRO Desalination Plant Capacity: Pre-treatment 2000 m3/day LOCATION: Seychelles CLIENT: Public Utilities Corporation COMPLETION YEAR: 2014 PROJECT STATUS: Completed

Containerized SeaWater Desalination System

SCOPE: Provision of Emergency Containerized Water Desalination Systems Capacity: 7 x 1000 m3/day LOCATION: Seychelles Island CLIENT: Public Utilities Corporation COMPLETION YEAR: 2011 PROJECT STATUS: Completed

Sea Water Reverse Osmosis System – Al Garneen Island

SCOPE: Design, Supply, Installation and Testing of Sea Water Reverse Osmosis Desalination Plant Capacity: Pre-treatment 100,000 IGPD LOCATION: Al Garneen Island, Abu Dhabi - United Arab Emirates CLIENT: Abu Dhabi Distribution Company COMPLETION YEAR: 2013 PROJECT STATUS: Completed

INTAKE SYSTEM – PERSEVERANCE CONTAINERIZED SWRO PLANT

SCOPE: Design, Supply, Installation of Sea Water Intake System for Perseverance (Mahe) Containerized SWRO Units Capacity: 5,960 m3/day flow LOCATION: Seychelles CLIENT: Public Utilities Corporation COMPLETION YEAR: 2013 PROJECT STATUS: Completed

SWRO Desalination Plant – Al Yasat Island

SCOPE: Supply, Installation, Operation and Maintenance for SWRO Desalination Plant Capacity: 2000 m3/day LOCATION: Al Yasat Island - United Arab Emirates CLIENT: Department of The President's Affairs COMPLETION YEAR: 2014 PROJECT STATUS: Completed

STP – Qseewrah Al Ain

SCOPE: Supply, Installation, Testing and Commissioning and Maintenance of complete Containerized Sewage Treatment Plant & Vacuum Sewer System. CLIENT: Department of The President's Affairs LOCATION: Abu Dhabi - United Arab Emirates COMPLETION YEAR: 2009 PROJECT STATUS: Completed

Sea Water Intake System – Bel Ombre SWRO Units

SCOPE: Design, Supply, Installation of Sea Water Intake System - Belombre SWRO Units Capacity: 12,690 m3/day CLIENT: Public Utilities Corporation LOCATION: Seychelles COMPLETION YEAR: 2014 PROJECT STATUS: Completed

Mahe Desalination Extension II – Providence Site

SCOPE: Mahe Desalination Extension II - The works is a design & build project which includes mechanical, electrical The works is a design & build project which includes mechanical, electrical and civil works for extension of the desalination plant facilities at Providence including 30,000 m3/day...

TORNADO WATER TREATMENT

P.O. Box: 4326, 2nd Floor, SIT Tower, Silicon Oasis, Dubai, UAE

Tel: +971 4 258 1077

Fax: +971 4 258 1078

Email: info@tornado-group.com

 
 
 
 

Verification